Project & Crew Information:

  • General Contractor: Kiewit
  • Rebar Contractor: D.T. Read Steel
  • Union: Non-Union
  • Crew Size: 5 person
  • Shift Duration: 10 hour
  • Products Used: TyBOT
  • April 2024 – May 2024

TyBOT Performance Metrics:

  • Actual Ties: 58,215 (63% Total)
  • Active Production Hours: 51
  • Active Tie Rate: 1,205 Ties/HR
  • Total Equipment Hours: 79
  • Active Production Rate = 65%
  • TyBOT Shifts = 9
  • Total Shifts = 9
  • TyBOT Utilization Rate = 100%

ACR Project Scope:

  • 4 of 4-Span Bridge Deck
  • Bridge Deck SF: 25,154
  • Width: 42'
  • Length: 610’
  • Horizontal Deck Rebar: 203,061 LBS
  • TieSpecs: 50% Bottom / 100% Top
  • Required Tied Intersections: 91,928

No items found.

Location:

  • Little Rock, Arkansas

Client:

  • D.T. Read

General Contractor:

  • Kiewit Corporation

Completion Date:

  • April 15, 2024

Deck Width (FT.):

  • 100

Bridge Deck Area (SQ. FT.):

  • 136,650

Deck Rebar (LBs):

  • 1,355,911

Total Ties:

  • 381,142

Tie Requirements:

  • 50% Bottom / 50% Top

IronBOT LBs Placed:

  • N/A

Heading 2

  • Item A
  • Item B
  • Item C

Text link

Bold text

Emphasis

Superscript

Subscript

Discover Our Rebar Robots

Explore how TyBot and IronBot can revolutionize your rebar installation process today.

TyBOT autonomous rebar tying robot on a bridge deck, viewed from the side